WOOSTER WATER SYSTEM – NEW WATER TANK!
We have added a new Master Meter connection to the Greers Ferry Water Main Line, which makes two (2) connections now. We built a new water tank (Brannon Rd) which makes a total of three (3) tanks and we added … Continue reading →